Video call with our Sales Department. Schedule your appointment.


Isla de Arosa conquers Alcalá de Henares: Stage II released for sale

 

The exclusive Isla de Arosa development has become the development that has generated most interest in one of the most prominent areas of Alcalá de Henares. Following the success of Stage I, which has virtually sold out, Gestilar has released the second part of this property development for sale.

It is a complex of 122 2-, 3- and 4-bedroom homes, each with its own terrace and surrounded by an exclusive private development with a controlled single point of access and facilities such as a swimming pool, a paddle ball court, a play area, a gymnasium, a communal hall and ample tree-lined green spaces.

Designed by the prestigious architecture firm of Rafael de la Hoz, sustainable elements have been incorporated into the exclusive homes in Isla de Arosa, whose façade allows for excellent climate and humidity control to ensure thermal, acoustic and light comfort.

Its beautiful location is one of the strong points of the Isla de Arosa offering: it is located in an area undergoing a transformation, just 8 minutes’ walk from the old city centre of Alcalá de Henares and 5 minutes by car to La Garena train station and the main shopping centres in the area.

With all of the above,Isla de Arosa offers magnificent, high-quality homes with a contemporary design that, as a whole, create a harmonious space that is perfect for getting away from the stresses of day-to-day life so that you can find “time for you” there.

As is the case with all of our free-market housing projects, Isla de Arosa is offered for sale directly to the public and, therefore, comes with total security and a guarantee for our clients.

For future visits, interested parties will be able to schedule their appointments on the website or through the sales office located on the development itself, opposite the plot under construction (Calle Ucrania 3).

Construction on Stage 1 has commenced, with these homes scheduled for delivery in the second quarter of 2018. Work will soon start on Stage II. We will keep you informed of any developments.

 

08/05/2017